docs(app): record measured graph layout landing and next routing slice

This commit is contained in:
2026-10-21 16:35:20 +01:00
parent ec9e8897db
commit a9237ee023
+6 -5
View File
@@ -28,8 +28,9 @@ All work under app/. Existing applications remain running and unchanged.
| T1a | Templates/validate/create-only requests | run57 / candidateef2f463 | manager reran13 focused tests + analyze, pass; exact create-only/source preservation checked | merged main, ancestry verified | — |
| S1b | Native read-only schedule list | run58 / flutter/s1-list | original export repaired; Review resumed | pending review/landing | pending |
| P2a | Graph identities/recorded-visit model | run59 / commit2c10507 | manager reran41 focused tests + analyze, pass; scoped 4 pure domain files | merged main, ancestry verified | no renderer/layout yet |
| P2b | Content-sized graph node layout | run60 / flutter/p2-layout | Task v6, Flash; explicit measured extents, no fixed CSS dimensions | running | — |
| P2b | Content-sized graph node layout | run60 / commitc1f140b | manager checked caller-supplied extents + reran21 tests/analyze, pass | mainec9e889, ancestry verified | geometry only, no renderer |
| A1a | Artifact records/grouping/safe URL navigation | run61 / flutter/a1-data | Task v6, Flash; pure data/security fixtures | running | — |
| P2c | Edge routes and measured label geometry | run62 / flutter/p2-routes | Task v6, Flash; separate from painter/widgets | running | — |
## Next ready work
- P1 pipelines list/detail/source/version; P2 graph and stage/visit selection.
@@ -114,10 +115,10 @@ that exact candidate. Staged binary in approved OpenCode temp directory is
pipelines-server-exportfix-b4627e2; rollback copy is
pipelines-server-before-exportfix-66779. Installed binary/launchd registration
remain untouched. This avoids deploying unrelated newer main changes.
Graph lane59 is finished/landed. New launches are temporarily held to allow a
quiescent installation window once operator restart approval arrives; native
schedule list58 continues, template data57 is finished/accepted. This is a
deployment dependency, not a reason to replay or discard completed feature work.
The temporary launch pause ended after the direct, safe server installation.
Graph/model/layout lanes have progressed, and independent small tasks continue
alongside the seven restored feature reviews. No repeat approval gate remains
for routine authorized recovery/integration.
User asked about failed runs; explicit status inspection found runs34/37/39/42/
49/50 are waiting, not failed: each Code visit1 computed success and is quiescent,