d35739cb49
An exhausted export recovery job left its run parked forever in the export wait, reserving the workspace and refusing later scheduled runs (runs 221/226: OpenCode sessions above the 8 MiB export bound are always truncated, so every retry stays partial). A gate is now releasable when its job is exhausted: the visit keeps its partial/unavailable evidence and diagnostic (still repairable), the run continues to its next stage or terminal, and the workspace is freed. Gates older than 15 minutes with a pending, lease-expired or missing job are exhausted by a bounded wait. The worker reconciles on its first tick after startup and every 30 seconds, so existing wedged runs recover after a restart. Truncation diagnostics now name the size bound.