Merge branch 'main' into web-run-tabs
This commit is contained in:
+2
-2
@@ -23,10 +23,10 @@ Status legend: `todo` · `partial` (some of it works) · `done` (working + captu
|
||||
| --- | --- | --- | --- |
|
||||
| P1 | Pipeline list | `list_pipelines` | done — row: name; `id {id} · v{version} · {N stages}`; `updated d MMM HH:mm`; last-run line joined from `list_runs` (status chip + `{ago} · {duration} · run {id}`, or `no runs recorded`) |
|
||||
| P2 | Filter + sort (status/name/updated) | client-side | done — Filter menu (name contains, Runs Any/Has runs/No runs, Last run status over the 7 server states, Clear filters) + Sort menu (Server order default, Name A–Z/Z–A, Most recent run, Fewest/Most stages, Reset); server order preserved |
|
||||
| P3 | Pipeline detail: stages, graph, versions, last run, content hash | `get_pipeline` | done — Summary/Graph/Source tabs; Summary shows content hash (monospace), latest version (`v{n}` or blank), created/updated, and a collapsed-by-default Versions section. Graph tab shows the browser guidance note only; the rendered graph is P6 |
|
||||
| P3 | Pipeline detail: stages, graph, versions, last run, content hash | `get_pipeline` | done — Summary/Graph/Source tabs; Summary shows content hash (monospace), latest version (`v{n}` or blank), created/updated, and a collapsed-by-default Versions section. Graph tab shows the browser guidance note plus the rendered workflow graph (P6) |
|
||||
| P4 | Templates gallery + template detail | `list_templates`, `validate` | done |
|
||||
| P5 | Create pipeline from a template (validate then submit) | `validate`, `submit` | todo |
|
||||
| P6 | Workflow graph rendering (nodes, edges, stage panes) | `get_pipeline` | todo |
|
||||
| P6 | Workflow graph rendering (nodes, edges, stage panes) | `get_pipeline` | done (captured 2026-10-19: nodes + labelled outcome edges + success/failure terminals, an opened stage definition pane and the expanded view — `captures/08-pipeline-graph.png`, `captures/08a-pipeline-graph-stage-pane.png`, `captures/08b-pipeline-graph-expanded.png`). Reusable `src/graph.js` (`mount` + pure helpers: layout, edges, `error*`, lanes, fit/clamp/zoom, hit-test, stage-definition fields); definition view only, so R5's run-detail Graph tab stays todo. Pane labels match the app's own vocabulary (`Outcomes`, `Tools`) rather than the checklist's category words |
|
||||
|
||||
## Runs
|
||||
| # | Feature | Protocol | Status |
|
||||
|
||||
Reference in New Issue
Block a user